TurnYourSolarEnergy-VirtualWatt

Virtual Watt VPP Offers

Start saving with Virtual Watt’s VPP

Turn your solar and battery into monthly savings.

With our Virtual Power Plant (VPP) cap plans, you’ll enjoy predictable bills, daily credits, and smarter energy trading – no extra effort needed.

GET STARTED

Ready? Here’s what you need to join a VPP with Virtual Watt

Stable Internet Connection

Ensure you have a stable internet connection through ethernet or Wi-Fi.

Solar System and Battery Bundle

Own or plan to purchase a solar system as part of a solar battery bundle.

Compatible Battery

Own or plan to purchase a compatible battery for the system.

Smart Meter Installation

Have a smart meter installed at your property, or agree to have one installed.

Our VPP Offers

VW Standard

$79monthly

Minimum Solar PV Capacity:
6.6 kW
Minimum Battery Capacity:
10 kWh
Annual Usage Allowance:
4500 kWh
(Total energy usage:
grid import)
Excess Usage Rate:
33.70 c/kWh
Market Participation Credit:
(The daily credit applies only when your battery is online.)
$0.5 per day
*Sign up Promotion $30 a quarter for the first 12 months
Demand Pass-through Fees*
$5.13/$9.0 peak kw/month
(Charged by your network provider, varies based on your assigned network tariff.)

VW Boost

$99monthly

Minimum
10 kW
Minimum Battery Capacity:
15 kWh
Annual Usage Allowance:
6000 kWh
(Total energy usage:
grid import)
Excess Usage Rate:
33.70 c/kWh
Market Participation Credit:
(The daily credit applies only when your battery is online.)
$0.5 per day
*Sign up Promotion - $30 a quarter for the first 12 months
Demand Pass-through Fees*
$5.13/$9.0 peak
kw/month
(Charged by your network provider, varies based on your assigned network tariff.)

VW Energetic

$129monthly

$129monthly
13.2 kW
Minimum Battery Capacity:
20 kWh
Annual Usage Allowance:
8100 kWh
(Total energy usage:
grid import)
Excess Usage Rate:
33.70 c/kWh
Market Participation Credit:
(The daily credit applies only when your battery is online.)
$0.5 per day
*Sign up Promotion $30 a quarter for the first 12 months
Demand Pass-through Fees*
$5.13/$9.0 peak
kw/month
(Charged by your network provider, varies based on your assigned network tariff.)
*Generic Conditions:
  • No contract term
  • No lock in contracts or exit fees
  • Monthly based on available data
  • Electronic delivery only
  • Direct Debit only
*Basic Terms:
  • Minimum Solar Capacity
  • Minimum Battery Capacity
  • Annual Usage Allowance
  • Minimum Generation Thresholds
  • Annual Export Threshold
  • Excess usage charged at a fixed kWh rate
  • Capped price excludes Demand Pass-through Fees
  • Networked Fixed Prices included in the cap plan
  • Network variable fees are included in Monthly Charge except for excess usage which includes the variable network fees in c/kWh charge
  • Environmental and AEMO charges are included in Monthly Charge except for excess usage which includes the variable network fees in c/kWh charge
  • Metering Fees are included in the cap plan
  • Solar Feed in Tariff is paid as a c/kWh charge
  • Monthly Fee includes GST

Boost your energy savings

Reach out to us here or sign up your interest below.

Back To Top